Friday, February 24, 2012

İlker Tuğru 503111301 1st week words


1- Scheduling (in flexible manufacturing systems)
2- Natural language processing (in Artificial intelligence)
3- Product quality
4- Material costs
5- Direct labor costs
6- Cost reduction
7- Random sampling ( in statistical quality control)
8- Quality circle
9- Unilateral tolerancing
10- Circular interpolation

Good luck everybody for the semester...

7 comments:

  1. Natural language processing
    Unilateral Tolerance
    Direct Labor Costs
    Circular Interpolation
    Cost Reduction

    kelimelerini gonderim.

    ReplyDelete
  2. o kelimeleri kimse yanıtlamamışsa yanıtlamandan memnun olurum :)

    ReplyDelete
    Replies
    1. Guncelleme: Aciklamalarda yeni ve eski olanlari belittim ve bana gore hangisi daha iyi onu da ekledim.

      Delete
    2. özenli bir çalışma olmuş eline sağlık teşekkür ederim

      Delete
  3. material costs henüz yanıtlanmamış sanırım.

    ReplyDelete
  4. This comment has been removed by the author.

    ReplyDelete