Monday, April 4, 2011

Ozan Kovancı - 8th Week

1. Emulsifier
2. Rolling through time
3. Evaluating Effectiveness
4. FAS (Final Assembly Schedule)
5. Order Point methods
6. Flexible systems
7. FDL (First Day Load)
8. Dyad by dyad approach
9. Implosion
10. Bandwidth concept

think in industrial way guys :)

1 comment:

  1. the term "Flexible Sytems" is very common? What kind of flexible Systems. Manufacturing. İf you askinf FMS it had already been asked before.

    ReplyDelete