1. Maximum Material
Condition (MMC)
2. International Tolerance
Grade (IT)
3. Fit (for dimensioning
and tolerancing)
4. Payback Period Method
5. Present Worth Method
Uniform
6. Annual Cost Method
7. Rate-of-Retun Method
8. Boring Cycle (in
G-coding)
9. Spot Drilling (in
G-coding)
10. Facing Cycle (in
G-coding)
This comment has been removed by the author.
ReplyDelete