Saturday, March 3, 2012

Esin Coskuner- 503091330 (2nd week words)

1- Virtual Prototyping (*was taken)
2- Design for Assembly (DFA)
(*was taken)
3- Design for Manufacturing and Assembly (DFMA)
(*was taken)
4- Design for Disassembly (DFD)
(*was taken)
5- Nanofabrication
(*was taken)
6- JIT (Just in time)
(*was taken)
7- GT (Group Technology)
(*was taken)
8- FMS (Flexible Manufacturing System)
(*was taken)
9- IT (Information Technology)
(*was taken)
10- BOM (Bill of Materials)
(*was taken)

3 comments:

  1. Arkadaşlar önceki postlarına yeni kelimeleri de eklediklerinde, son ekleme zamanı yerine ilk yazma zamanı gözüküyor. Puanlandırma zamanı geldiğinde hatalar düzeltilebilecektir.

    ReplyDelete
  2. FMS (Flexible Manufacturing System)

    ReplyDelete